Saturday, March 29, 2008

Reno Day 12 (Delivery of taps and stuffs)

Met up with our ID today to hand over the taps and stuffs. The water pipes people also came in today to determine the positions of the pipes. Pretty busy day today!

According to our ID, toilet bowls and basins should be installed by Wed! Yipeee!

Delivery of taps and stuffs

Photobucket


Skirting done for Living hall

Photobucket


More tiles laid in the bedrooms

Photobucket

Photobucket


Toilets tiles 80% laid

Photobucket


Kerb between Kitchen and common toilet

Photobucket


Kitchen Floor tiles

Photobucket


Laying of water drainage pipes for kitchen sink

Photobucket

No comments: