Met up with our ID today to hand over the taps and stuffs. The water pipes people also came in today to determine the positions of the pipes. Pretty busy day today!
According to our ID, toilet bowls and basins should be installed by Wed! Yipeee!
Delivery of taps and stuffs
Skirting done for Living hall
More tiles laid in the bedrooms
Toilets tiles 80% laid
Kerb between Kitchen and common toilet
Kitchen Floor tiles
Laying of water drainage pipes for kitchen sink
Saturday, March 29, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment